Today's walk through confirmed that all electrical and plumbing work has been completed.
Our lovely kitchen with goose neck tap. Awaiting splash back tiles now that the stone bench tops have been installed. |
It might be Andy's job to figure out the aircon programming. |
There are lots of other little bits and pieces being done along the way. One of the internal doors is being replaced and a couple of light switches need checking, plus a few plaster touch ups are needed here and there, but our SS seems to be really on top of things so we are pretty confident that everything will go to plan over the next few weeks.
The oven, dishwasher and rangehood will be installed just before handover to prevent theft.
Hopefully the Easter and ANZAC day public holidays don't slow things down too much. We will no doubt be spending our Easter break packing!